A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance
- Source :
- Ellis, J, Edwards, D, Thwala, W D, Ejohwomu, O, Ameyaw, E E & Shelbourn, M 2021, ' A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance ', Buildings, vol. 11, no. 6, 260, pp. 1-30 . https://doi.org/10.3390/buildings11060260, https://doi.org/10.3390/buildings11060260, Buildings, Vol 11, Iss 260, p 260 (2021)
- Publication Year :
- 2021
- Publisher :
- MDPI, 2021.
-
Abstract
- This research explores the failure of competitively tendered projects in the UK construction industry to procure the most suited contractor(s) to conduct the works. Such work may have equal relevance for other developed nations globally. This research seeks to teach clients and their representatives that “lowest price” does not mean “best value”, by presenting a case study of a successfully negotiated tender undertaken by a small-to-medium enterprise (SME) contractor; SME studies are relatively scant in academic literature. By applying the “lessons learnt” principle, this study seeks to improve future practice through the development of a novel alternative procurement option (i.e., negotiation). A mixed philosophical stance combining interpretivism and pragmatism was used—interpretivism to critically review literature in order to form the basis of inductive research to discuss negotiation as a viable procurement route, and pragmatism to analyse perceptions of tendering and procurement. The methods used follow a three-stage waterfall process including: (1) literature review and pilot study; (2) quantitative analysis of case study data; and (3) qualitative data collection via a focus group. Our research underscores the need to advise clients and their representatives of the importance of understanding the scope of works allowed within a tender submission before discounting it based solely on price. In addition, we highlight the failings of competitive tendering, which results in increased costs and project duration once the works commence on site. These findings provide new contemporary insight into procurement and tendering in the construction industry, with emphasis on SME contractors, existing relationships, and open-book negotiation. This research illustrates the adverse effects of early cost estimates produced without first securing a true understanding of project buildability and programming. Our work concludes with a novel insight into an alternative procurement option that involves early SME contractor involvement in an open-book environment, without the need for a third-party cost control.
- Subjects :
- Process management
Cost estimate
media_common.quotation_subject
0211 other engineering and technologies
Qualitative property
02 engineering and technology
Procurement
tendering and procurement
negotiation
021105 building & construction
0502 economics and business
Architecture
Waterfall model
predicted cost
UK construction
Civil and Structural Engineering
media_common
Building construction
Scope (project management)
K900
K200
05 social sciences
“race to the bottom”
Building and Construction
Best value
rework
”race to the bottom”
Focus group
Negotiation
Business
TH1-9745
050203 business & management
Subjects
Details
- Language :
- English
- ISSN :
- 20755309
- Database :
- OpenAIRE
- Journal :
- Ellis, J, Edwards, D, Thwala, W D, Ejohwomu, O, Ameyaw, E E & Shelbourn, M 2021, ' A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance ', Buildings, vol. 11, no. 6, 260, pp. 1-30 . https://doi.org/10.3390/buildings11060260, https://doi.org/10.3390/buildings11060260, Buildings, Vol 11, Iss 260, p 260 (2021)
- Accession number :
- edsair.doi.dedup.....ada64392c5b33b5ced9f17ef3f2c83ec
- Full Text :
- https://doi.org/10.3390/buildings11060260