Back to Search Start Over

Long term operation of continuous-flow system with enhanced biological phosphorus removal granules at different COD loading

Authors :
Yufeng Lv
Dong Li
Zeng Huiping
Jie Zhang
Source :
Bioresource technology. 216
Publication Year :
2016

Abstract

In this study, a continuous-flow system with enhanced biological phosphorus removal (EBPR) granules was operated at different COD concentrations (200, 300 and 400mgL(-)(1)) to investigate the effect of COD loading on this system. The results showed that when the COD concentration in influent was increased to 400mgL(-)(1), the anaerobic COD removal efficiency and total phosphorus removal efficiency reduced obviously and the settling ability of granules deteriorated due to the proliferation of filamentous bacteria. Moreover, high COD loading inhibited the EPS secretion and destroyed the stability of granules. Results of high-through pyrosequencing indicated that filamentous bacteria had a competitive advantage over polyphosphate-accumulating organisms (PAOs) at high COD loading. The performance of system, settling ability of granules and proportion of PAOs gradually recovered to the initial level after the COD concentration was reduced to 200mgL(-)(1) on day 81.

Details

ISSN :
18732976
Volume :
216
Database :
OpenAIRE
Journal :
Bioresource technology
Accession number :
edsair.doi.dedup.....c87c3d6fd98d5f4c41743b8e32fc4e01