Analysis the possibility of increasing capacity of copper ore mining at the open pit South Mining District Majdanpek at 11x106 tons annually

Authors :
Milenko Ljubojev
Radmilo Rajković
Miomir Mikić
Daniel Krzanovic
Source :
Mining and Metallurgy Engineering Bor (2015) (3):73-88
Publication Year :
2015
Publisher :
Centre for Evaluation in Education and Science (CEON/CEES), 2015.

Abstract

The paper analyzes the possibility of increasing capacity at the Open Pit South Mining District in terms of achieving maximum net present value. The analysis is based on the movement of discounted cash flow during exploitation period of 18 years. The modern approach of designing the open pits was used for this consideration using the software Whittle and Gemcom Gems. The analysis showed a positive trend of discounted cash flow from the third year until the end of analyzed period in achieving the net present value in the amount of 596 252 546 $.

Details

ISSN :
23348836
Database :
OpenAIRE
Journal :
Mining and Metallurgy Engineering Bor
Accession number :
edsair.doi.dedup.....dd431cf150097d3c4f0574f1bc71c2d7
Full Text :
https://doi.org/10.5937/mmeb1503073k