Back to Search
Start Over
A New Approach to Determine the Critical Path in Stochastic Activity Network
- Source :
- Mathematical Problems in Engineering, Vol 2014 (2014)
- Publication Year :
- 2014
- Publisher :
- Hindawi Limited, 2014.
-
Abstract
- The determination of the critical path (CP) in stochastic networks is difficult. It is partly due to the randomness of path durations and partly due to the probability issue of the selection of the critical path in the network. What we are confronted with is not only the complexity among random variables but also the problem of path dependence of the network. Besides, we found that CP is not necessarily the longest (or shortest) path in the network, which was a conventional assumption in use. The Program Evaluation and Review Technique (PERT) and Critical Path Index (CPI) approaches are not able to deal with this problem efficiently. In this study, we give a new definition on the CP in stochastic network and propose a modified label-correcting tracing algorithm (M-LCTA) to solve it. Based on the numerical results, compared with Monte Carlo simulation (MCS), the proposed approach can accurately determine the CP in stochastic networks.
- Subjects :
- Continuous-time stochastic process
Mathematical optimization
Article Subject
Stochastic modelling
Computer science
General Mathematics
lcsh:Mathematics
Monte Carlo method
General Engineering
lcsh:QA1-939
Longest path problem
Program evaluation and review technique
lcsh:TA1-2040
Shortest path problem
Path (graph theory)
Stochastic optimization
Stochastic neural network
lcsh:Engineering (General). Civil engineering (General)
Random variable
Critical path method
Randomness
Mathematics
Subjects
Details
- Language :
- English
- ISSN :
- 15635147
- Volume :
- 2014
- Database :
- OpenAIRE
- Journal :
- Mathematical Problems in Engineering
- Accession number :
- edsair.doi.dedup.....edc61db562a63e0db3735ee557c54835