Experience with Long-pulse Operation of the PIP2IT Warm Front End
- Publication Year :
- 2019
-
Abstract
- The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.<br />Comment: 4 pages, NAPAC2019