Back to Search Start Over

Hydraulic fracturing method for relieving stress concentration in remaining coal pillar in overlying goaf

Authors :
Luying Shao
Bingxiang Huang
Xinglong Zhao
Shuliang Chen
Source :
Energy Science & Engineering, Vol 12, Iss 4, Pp 1518-1530 (2024)
Publication Year :
2024
Publisher :
Wiley, 2024.

Abstract

Abstract The stress concentration caused by the presence of the remaining coal pillar in the overlying goaf can easily cause large deformation of the roadway in the lower seam and other problems. To solve this problem, the reasons for stress concentration caused by the remaining coal pillar in the overlying goaf were analyzed. A hydraulic fracturing method for relieving stress concentration has been proposed. By using hydraulic fracturing technology to remove the hanging roof on both sides of the coal pillar and weaken the coal pillar system, high stress is transferred to the goaf. The degree of stress concentration in coal pillars and surrounding rock of roadway can be reduced by 47% and 26%, respectively. This method can also solve the stress concentration problem of the remaining ore pillar in the overlying goaf of the metal ore. This method has been applied in the coal mine. The deformation of the surrounding rock of the test roadway after hydraulic fracturing has been reduced by more than 60%.

Details

Language :
English
ISSN :
20500505
Volume :
12
Issue :
4
Database :
Directory of Open Access Journals
Journal :
Energy Science & Engineering
Publication Type :
Academic Journal
Accession number :
edsdoj.19bb82743a774a1593a7aea1d766b6b8
Document Type :
article
Full Text :
https://doi.org/10.1002/ese3.1684