Cite
Optimizing Budget Deficit in Multi-Construction Projects Using Sequential Quadratic Programming
MLA
Hasan Musaab Falih, et al. “Optimizing Budget Deficit in Multi-Construction Projects Using Sequential Quadratic Programming.” Civil and Environmental Engineering, vol. 20, no. 2, Dec. 2024, pp. 767–89. EBSCOhost, https://doi.org/10.2478/cee-2024-0058.
APA
Hasan Musaab Falih, Sodani Noor A. Abdul-Jabbar Al, Salih Jihan Maan, & Mohammed Sawsan Rasheed. (2024). Optimizing Budget Deficit in Multi-Construction Projects Using Sequential Quadratic Programming. Civil and Environmental Engineering, 20(2), 767–789. https://doi.org/10.2478/cee-2024-0058
Chicago
Hasan Musaab Falih, Sodani Noor A. Abdul-Jabbar Al, Salih Jihan Maan, and Mohammed Sawsan Rasheed. 2024. “Optimizing Budget Deficit in Multi-Construction Projects Using Sequential Quadratic Programming.” Civil and Environmental Engineering 20 (2): 767–89. doi:10.2478/cee-2024-0058.