Cite
TIME CONTROL AND RESCHEDULING USING METHOD CPM (CRITICAL PATH METHOD)
MLA
Almuntofa Purwantoro, et al. “Time Control and Rescheduling Using Method Cpm (Critical Path Method).” Jurnal Civil Engineering Study, vol. 4, no. 01, Apr. 2024. EBSCOhost, https://doi.org/10.34001/ces.v4i01.801.
APA
Almuntofa Purwantoro, Attie Wawey Lagi To’unni, & Subrata Aditama K.A. Uda. (2024). Time Control and Rescheduling Using Method Cpm (Critical Path Method). Jurnal Civil Engineering Study, 4(01). https://doi.org/10.34001/ces.v4i01.801
Chicago
Almuntofa Purwantoro, Attie Wawey Lagi To’unni, and Subrata Aditama K.A. Uda. 2024. “Time Control and Rescheduling Using Method Cpm (Critical Path Method).” Jurnal Civil Engineering Study 4 (01). doi:10.34001/ces.v4i01.801.