Scheduling with the Probabilistic Coupling Method I (PTCM I) – assuming the continuity of work of working teams

Authors :
Paulina Kostrzewa-Demczuk
Magdalena Rogalska
Source :
Archives of Civil Engineering, Vol vol. 69, Iss No 2, Pp 455-469 (2023)
Publication Year :
2023
Publisher :
Polish Academy of Sciences, 2023.

Abstract

Modeling and numerical analysis of the design of building structures, their technology, organization and management methods of construction processes are the subject of the work of many scientists in Poland. Schedule designers try to best reflect the reality of construction projects with the available methods, although this procedure is not always successful. One of the scheduling methods is the Time Coupling Methods (TCM), which can be refined using the predictive durations of the Multivariate Method of Statistical Models (MMSM) construction processes and standard deviations. A new scheduling method in the probabilistic approach was developed – Probabilistic Time Couplings Method I (PTCM I). At PTCM I, work is organized in such a way as to maintain the continuity of work of employees, as downtime of workers is disadvantageous and costly. The total duration of the new investment was forecasted and compared with the other methods of scheduling and with real time after its completion. The results clearly show that the developed methodology can be successfully used in scheduling construction works.

Details

Language :
English
ISSN :
12302945 and 23003103
Volume :
. 69
Issue :
2
Database :
Directory of Open Access Journals
Journal :
Archives of Civil Engineering
Publication Type :
Academic Journal
Accession number :
edsdoj.241903cadfe2418f98cf3434eace3d7e
Document Type :
article
Full Text :
https://doi.org/10.24425/ace.2023.145278