Back to Search
Start Over
Research on Operational Safety Risk Assessment Method for Long and Large Highway Tunnels Based on FAHP and SPA
- Source :
- Applied Sciences, Vol 13, Iss 16, p 9151 (2023)
- Publication Year :
- 2023
- Publisher :
- MDPI AG, 2023.
-
Abstract
- Compared to the construction phase, the assessment of tunnel safety risks during the operational stage has not been thoroughly conducted, and the related research work is relatively lagging. To deepen the research and application of theoretical methods for assessing operational tunnel safety risks, and to improve the level of hazard investigation and prevention in long and large highway tunnels, this paper establishes a tunnel section assessment index system from four perspectives: tunnel condition, traffic characteristics, operational environment, and operational management. A combined qualitative and quantitative approach is employed, and a practical classification standard for the indicators is proposed. Based on the traditional Analytic Hierarchy Process (AHP) and fuzzy analysis theory, a new form of questionnaire survey, known as the expert system analysis method, is introduced to collect expert opinions. A novel approach for determining fuzzy numbers based on expert opinions is proposed. Consequently, a combined model for assessing operational tunnel safety risks in long and large highways is established by integrating the Fuzzy Analytic Hierarchy Process (FAHP) and the Set Pair Analysis (SPA). This model effectively combines subjective weighting with objective evaluation, thereby enhancing the accuracy of operational tunnel safety risk assessment for long and large highways. The safety risks of three long and large tunnels within the G1523 Yongguan Expressway were assessed using the evaluation method proposed in this paper. A comparative analysis was conducted between the results obtained using the proposed Fuzzy Analytic Hierarchy Process (FAHP) and Set Pair Analysis (SPA) method and the traditional Analytic Hierarchy Process (AHP) evaluation. The results indicate that the operational tunnel safety risk assessment method based on FAHP and SPA exhibits greater rationality and accuracy compared to the traditional AHP approach.
Details
- Language :
- English
- ISSN :
- 20763417
- Volume :
- 13
- Issue :
- 16
- Database :
- Directory of Open Access Journals
- Journal :
- Applied Sciences
- Publication Type :
- Academic Journal
- Accession number :
- edsdoj.2ea23fe8aa13421d80b88b6fe89adefd
- Document Type :
- article
- Full Text :
- https://doi.org/10.3390/app13169151