Back to Search Start Over

RESEARCH OF THE MOBILE TOWER CRANE TOWER DOWN FOUR-BAR LINKAGE

Authors :
SHANGGUAN JianLin
LIU DePing
Source :
Jixie qiangdu, Vol 38, Pp 649-652 (2016)
Publication Year :
2016
Publisher :
Editorial Office of Journal of Mechanical Strength, 2016.

Abstract

To solve the problem of transition of the tower crane with high center of gravity,through sex difference,fixed transportation for the tower body and its attached parts being put down may be regarded as a fast and efficient method. Four-bar linkage was adopted to put down the towerbody,its working principle is introduced,then the force analysis of its components is carried,finally,its simulation and optimization is carried out through using MATLAB. The feasibility and practicability of the method are verified by numerical examples and engineering practice.

Details

Language :
Chinese
ISSN :
10019669
Volume :
38
Database :
Directory of Open Access Journals
Journal :
Jixie qiangdu
Publication Type :
Academic Journal
Accession number :
edsdoj.640147dbf5e44edc87fc674555e16ab6
Document Type :
article
Full Text :
https://doi.org/10.16579/j.issn.1001.9669.2016.03.040