Back to Search Start Over

Accelerated mining method for salt-cavern gas storage

Authors :
Jun HE
Gang JING
Yan ZHAO
Chenglin WANG
Fan CHENG
Source :
You-qi chuyun, Vol 39, Iss 12, Pp 1435-1440 (2020)
Publication Year :
2020
Publisher :
Editorial Office of Oil & Gas Storage and Transportation, 2020.

Abstract

Underground gas storage, which serves as the auxiliary facility of the nature gas pipeline network, is veryimportant to maintain the stability of gas supply. In recent years, the construction of underground gas storage developsrapidly in China. However, due to the late construction, the underground gas storage cannot satisfy the growing demandof nature gas, and gas shortage has happened occasionally in winter. In view of the large investment and long constructiontime required for gas storage construction, generally 4 years required from mining to put into service, an accelerated miningmethod is put forward herein. Definitely, it is to inject gas while mining and to take the injected gas as the protective blanketof the cavity roof. In this way, not only the cost of blanket material can be reduced, but also the construction time can beshortened significantly. As shown in the simulation analysis, it is feasible to store gas while the underground storage isconstructed.

Details

Language :
Chinese
ISSN :
10008241
Volume :
39
Issue :
12
Database :
Directory of Open Access Journals
Journal :
You-qi chuyun
Publication Type :
Academic Journal
Accession number :
edsdoj.fe98d11e4d4a44ebb940aa6c3121d9c1
Document Type :
article
Full Text :
https://doi.org/10.6047/j.issn.1000-8241.2020.12.018