Back to Search
Start Over
Ventilation upgrade for Gotthard tunnel; Mario Gagliardi, director of the Gotthard Road Tunnel, and Marco Bettelini, director of INELMEC Ltd, and head equipment and safety for Lombardi Ltd, discuss the design, installation and verification of the Gotthard Road Tunnel' ventilation system renewal
- Source :
- Tunnels & Tunnelling International. April, 2004, Vol. 36 Issue 4, p20, 3 p.
- Publication Year :
- 2004
-
Abstract
- The 16.9km long Gotthard Road Tunnel in Switzerland, is the key element of one of the most important road connections through the Alps. The single-bore tunnel with bi-directional traffic on [...]
Details
- Language :
- English
- ISSN :
- 13693999
- Volume :
- 36
- Issue :
- 4
- Database :
- Gale General OneFile
- Journal :
- Tunnels & Tunnelling International
- Publication Type :
- Periodical
- Accession number :
- edsgcl.116794898