Assessing the FACTS at Kayenta

Authors :
Pereira, M.
Renz, K.
Unterla, F.
Source :
Modern Power Systems. Dec, 1993, Vol. 13 Issue 12, p 35, 3 p.
Publication Year :
1993

Abstract

Western Area Power Administration has utilized an advanced series compensation system (ACS) in the Shiprock-to-Glen Canyon section of its high voltage transmission system. Like other high voltage lines, the link could only run at 75% of its capacity. The ACS, installed at the Kayenta substation in Arizona, increased the line's capacity by 33%, enough energy to cover costs of the upgrade within four years. Similar systems are expected to be applied throughout the world.<br />The world's first advanced series compensator with controllable series impedance as a flexible AC transmission (FACTS) device has been introduced at Western Area Power Administration's Kayenta substation in Arizona, USA. [...]

Details

ISSN :
02607840
Volume :
13
Issue :
12
Database :
Gale General OneFile
Journal :
Modern Power Systems
Publication Type :
Periodical
Accession number :
edsgcl.14916742