- Source :
- European Journal of Operational Research. Feb 1, 1998, Vol. 104 Issue 3, p559, 13 p.
- Publication Year :
- 1998
-
Abstract
- A model for resource allocation with constraint problems takes into account renewable, nonrenewable and doubly constrained resources by the introduction of resource driven activity realization times and interruption costs. The method has been found to be effective in generating balanced histograms depicting graphical representations of resources and restructured activities at desired levels.