Back to Search Start Over

Test 119 CHILLERS IN SERIES WITH CC-2 AS LEAD, BASIC SYSTEM -- COMMISSIONING

Authors :
ELLIS, REBECCA
MCKEW, HOWARD
Source :
Engineered Systems. May, 2001, Vol. 18 Issue 5, 15
Publication Year :
2001

Abstract

Note: Test procedure assumes that the chilled water system is OFF at the start of the test. 1 Record the current chilled water supply temperatures at TT-1 and TT-2. Reset [...]

Details

ISSN :
08919976
Volume :
18
Issue :
5
Database :
Gale General OneFile
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
edsgcl.74991375