Back to Search Start Over

The new experiment WAGASCI for water to hydrocarbon neutrino cross section measurement using the J-PARC beam

Authors :
Ovsiannikova, T
Antonova, M
Bronner, C
Blondel, A
Bonnemaison, A
Cornat, R
Cadoux, F
Chikuma, N
Cao, S
Drapier, O
Izmaylov, A
Ichikawa, A K
Ferreira, O
Favre, Y
Gastaldi, F
Gonin, M
Hayashino, T
Hosomi, F
Hayato, Y
Koga, T
Kondo, K
Kin, K
Kudenko, Y
Khabibullin, M
Khotjantsev, A
Minamino, A
Mueller, Th A
Mefodiev, A
Mineev, O
Nakamura, K
Nakaya, T
Noah, E
Patel, N
Quilain, B
Rayner, M
Seiya, Y
Suvorov, S
Yershov, N
Yamamoto, M
Yamamoto, K
Yokoyama, M
Ovsiannikova, T
Antonova, M
Bronner, C
Blondel, A
Bonnemaison, A
Cornat, R
Cadoux, F
Chikuma, N
Cao, S
Drapier, O
Izmaylov, A
Ichikawa, A K
Ferreira, O
Favre, Y
Gastaldi, F
Gonin, M
Hayashino, T
Hosomi, F
Hayato, Y
Koga, T
Kondo, K
Kin, K
Kudenko, Y
Khabibullin, M
Khotjantsev, A
Minamino, A
Mueller, Th A
Mefodiev, A
Mineev, O
Nakamura, K
Nakaya, T
Noah, E
Patel, N
Quilain, B
Rayner, M
Seiya, Y
Suvorov, S
Yershov, N
Yamamoto, M
Yamamoto, K
Yokoyama, M
Publication Year :
2016

Abstract

The T2K (Tokai-to-Kamioka) is a long baseline neutrino experiment designed to study various parameters that rule neutrino oscillations, with an intense beam of muon neutrinos. A near detector complex (ND280) is used to constrain non-oscillated flux and hence to predict the expected number of events in the far detector (Super-Kamiokande). The difference in the target material between the far (water) and near (scintillator, hydrocarbon) detectors leads to the main non-canceling systematic uncertainty for the oscillation analysis. In order to reduce this uncertainty a new water grid and scintillator detector, WAGASCI, has been proposed. The detector will be operated at the J-PARC neutrino beam line with the main physics goal to measure the charged current neutrino cross section ratio between water and hydrocarbon with a few percent accuracy. Further physics program may include high-precision measurements of different charged current neutrino interaction channels. The concept of the new detector will be covered together with the actual construction plan.

Details

Database :
OAIster
Notes :
English
Publication Type :
Electronic Resource
Accession number :
edsoai.on1088303455
Document Type :
Electronic Resource