The construction of the North Downs tunnel.

Authors :
Bermingham A.G.
Underground construction 2001 London, UK 18-Sep-0120-Sep-01
Falkner L.
Watson P.C.
Bermingham A.G.
Underground construction 2001 London, UK 18-Sep-0120-Sep-01
Falkner L.
Watson P.C.
Publication Year :
2001

Abstract

The UK's largest railway tunnel is on target to be completed five months early and more than #10 000 000 below budget, a success achieved through innovation, value engineering, integrated design and construction, and effective project management. The construction process and logistics are described, including tunnel excavation, primary and secondary lining, tunnel waterproofing, construction of walkway supports, back grouting and completion of the portal canopies. The management of the project is examined and the process of contractor self-certification discussed.<br />The UK's largest railway tunnel is on target to be completed five months early and more than #10 000 000 below budget, a success achieved through innovation, value engineering, integrated design and construction, and effective project management. The construction process and logistics are described, including tunnel excavation, primary and secondary lining, tunnel waterproofing, construction of walkway supports, back grouting and completion of the portal canopies. The management of the project is examined and the process of contractor self-certification discussed.

Details

Database :
OAIster
Notes :
und
Publication Type :
Electronic Resource
Accession number :
edsoai.on1309222903
Document Type :
Electronic Resource