Back to Search Start Over

Dam Safety : Monitoring of Tailings Dams and Safety Reviews

Authors :
Adamo, Nasrat
Al-Ansari, Nadhir
Sissakian, Varoujan
Laue, Jan
Knutsson, Sven
Adamo, Nasrat
Al-Ansari, Nadhir
Sissakian, Varoujan
Laue, Jan
Knutsson, Sven
Publication Year :
2021

Abstract

The awareness to tailings dam safety monitoring and reviews has increased by the catastrophes resulting from failures of such dams worsened by increasing tailings waste and construction of larger dams. The losses born by the mining industry from high costs of compensations and environmental rehabilitation work have brought this matter into focus. In the present article the need for safety monitoring programs of tailings dam is highlighted and mode of failures and factors leading to them are described. Basic principles of such programs are investigated with all phenomena needing observation described and their impacts explained. As in conventional dams this work is carried out by visual inspections and use of similar methods and instruments. In similar manners in both types of dams’ observation and measurements are done for measuring seepage water quantity and quality, phreatic surface level and pore pressure and total earth pressure values in addition to deformation measurements; and all are done by similar devices and methods such as weirs, piezometers, inclinometers, settlement plates and geodetic surveying. Basic differences between safety monitoring systems of the two types of dam, however, are presented in a tabular form. The continuity of safety monitoring of tailings dams is emphasized not only during the long construction phase but also after that in the abandonment and closure phase which can last indefinitely in order to watch for possible adverse effects on the environment and ecosystem due to the winds eroding and carrying of poisonous tailings contents, in addition to contaminated seepage water entering surface water streams and ground water. Justifications for using real time monitoring systems for recording and transmitting all data to the control center are presented with emphasis given on savings in both labor and time and need for the discovery of warning signs enabling raising earlier the alarm of possible failure or incident and the early taking<br />Validerad;2020;Nivå 1;2020-09-29 (johcin)

Details

Database :
OAIster
Notes :
application/pdf, English
Publication Type :
Electronic Resource
Accession number :
edsoai.on1349031462
Document Type :
Electronic Resource
Full Text :
https://doi.org/10.47260.jesge.1117