SELECTION AND SCHEDULING OF INTERRELATED NETWORK IMPROVEMENT PROJECTS UNDER UNCERTAINTIES

Authors :
Wu, Fei
Wu, Fei
Publication Year :
2023

Abstract

The analysis of improvements in transportation networks is complicated by the interdependence of those improvements. Changes in links or nodes tend to shift traffic flows. Hence, the benefits of changes in any network component depend on what changes are made at what time in other components. There may also be synergies in the costs of implementing network changes. Methods are needed for selecting and scheduling interrelated network changes under uncertainties regarding demand, costs, implementation times and other factors. The proposed research focuses on optimizing the selection and schedule of interrelated network projects for enhancing a network’s performance under various uncertainties. Two multi-level models are formulated for analyzing problems on two types of transportation networks: rail freight networks in Problem 1 and road networks in Problem 2. For rail freight networks, the proposed tri-level model jointly optimizes short-term post-disruption restoration schedules and long-term network development schedules. Its lower level assigns capacitated freight flows to minimize total hourly cost, and its middle level optimizes the restoration sequence for the minimized cumulative cost increment (excess) during the restoration process under a given disruption scenario. At the upper level, given probabilistic disruption scenarios, network improvement projects are selected from a given set and sequenced to minimize the sum of construction cost and cumulative expected excess over the planning horizon. For road networks, the lower level of the proposed bi-level model performs user-equilibrium (UE) traffic assignment using the Frank-Wolfe (F-W) algorithm. The upper-level model first generates multiple scenarios with samples from the multivariate distribution of multiple correlated uncertain parameters. For a given long-term network improvement plan, an expected present value (PV) of cumulative system travel time cost over the planning horizon plus construction costs

Details

Database :
OAIster
Notes :
Schonfeld, Paul M.
Publication Type :
Electronic Resource
Accession number :
edsoai.on1410449529
Document Type :
Electronic Resource