Search

Showing total 227 results

Search Constraints

Start Over You searched for: Language english Remove constraint Language: english Region london (england) Remove constraint Region: london (england) Publisher thomas telford ltd Remove constraint Publisher: thomas telford ltd
227 results

Search Results

1. Centrifuge modelling of the effect of base slab stiffness on long-term heave and swell pressure.

2. Investigation of the strength evolution of lime-treated London clay soil.

3. Uphill excavation of an escalator barrel between operational underground platforms.

4. Thameslink programme, UK: design and construction of London Bridge station.

5. Successfully managing Covid-19 on tunnelling operations for the Thames Tideway Tunnel, UK.

6. Building climate resilience of UK's rail network through a multihazard approach.

7. Global Academy, London: how offsite modular construction is reshaping education.

8. Crossrail project: the impact of 4–18 Bishop's Bridge Road on the new Elizabeth line, London, UK.

9. Transient thermal response of a thermally activated pile during a long-term maintained load test at Lambeth College, London.

10. The net greenhouse gas impact of the Jubilee line extension in London, UK.

11. Effect of high-performance facades on heating/cooling loads in London, UK office buildings.

12. Heathrow Terminal 5: gaining permission.

13. Managing climate change transition risks: another potential role for civil engineers.

14. Impact of the Calder's Wharf development on Docklands Light Railway tunnels, London, UK.

15. Development over London Underground tunnels: No. 1 Grafton Street.

16. Upgrade of London Underground Bridge D70: Chiswick Park.

17. Assessment of undrained non-linear stiffness of clays using rigidity index.

18. Temporary works for demolition of Earls Court Exhibition Centre in London, UK.

19. Transforming delivery of Water Street Bridge abutment in London, UK through innovation.

20. Improving safety through design at London Underground's Bank station capacity upgrade.

21. Improving safety through design at London Underground's Bank station capacity upgrade.

22. Briefing: Modelling drainage across London Underground: a case study.

24. Behaviour of discrete piles used to stabilise a tree-covered railway embankment.

25. Finding safe routes to school using optimisation methods.

26. Evaluation of innovative sprayed-concrete-lined tunnelling.

27. Life-cycle assessment applied to construction of Thames Tideway east tunnel, London, UK.

28. Impact of the Crossrail tunnelling project on masonry buildings with shallow foundations.

29. Major sporting events—planning for legacy.

30. Volume loss experienced on open-face London Clay tunnels.

31. Raising the bar for occupational health management in construction.

32. Battersea cable tunnel: powering regeneration in central London, UK.

33. Cycling infrastructure in London.

34. London Underground: unravelling 150 years of structural secrets.

35. Heathrow Terminal 5: twin rivers diversion.

36. Heathrow Terminal 5: enhancing environmental sustainability.

37. 'Elred': new water for London from old assets.

38. Channel Tunnel Rail Link section 2: Stratford.

39. Thermal monitoring of a concrete bridge in London, UK.

40. Reassessing variations in the small-strain stiffness of London Clay.

41. Briefing: Contaminated land redevelopment in fragmented ownership.

42. Geotechnical variation of London Clay across central London.

43. Characteristics of the London Clay from the Terminal 5 site at Heathrow Airport.

44. Estimating volume loss for open-face tunnels in London Clay.

45. Briefing: Bringing brownfield sites back into use.

46. The influence of partial soil saturation on pile behaviour.

47. London 2012 legacy: Olympic Park waterways.

48. London 2012 legacy: putting London Underground on a new track.

49. Numerical modelling of a deep circular excavation at Abbey Mills in London.

50. Engineering The Shard, London: tallest building in western Europe.