Search

Your search keyword '"MC4: Hadron Accelerators"' showing total 320 results

Search Constraints

Start Over You searched for: Descriptor "MC4: Hadron Accelerators" Remove constraint Descriptor: "MC4: Hadron Accelerators" Language english Remove constraint Language: english
320 results on '"MC4: Hadron Accelerators"'

Search Results

1. Electron Cooling Experiment for Proton Beams with Intense Space-charge in IOTA

2. Implementation of RF channeling at the CERN PS for spill quality improvements

3. CEA Contribution to the PIP-II Linear Accelerator

4. Simulation Study of Fast Extraction in the Absence of One Septum Magnet for J-Parc Main Ring

5. Simulating Quasi-Integrable Optics with Space Charge in the IBEX Paul Trap

6. Studies on Pre-Computation of SPS-to-LHC Transfer Line Corrections

7. A New Approach to Cyclotron Design

8. Commissioning of the ELENA Electrostatic Transfer Lines for the Antimatter Facility at CERN

9. Proton Linac Design for the High Brilliance Neutron Source HBS

10. Proton Irradiation Site for Si-Detectors at the Bonn Isochronous Cyclotron

11. Hadron Storage Ring 4 O’clock Injection Design and Optics for the Electron-Ion Collider

12. The Electron-Ion Collider Hadron Storage Ring 10 O’clock Switchyard Design

13. Characterisation of Bunch-by-Bunch Tune Shift Effects in the CERN SPS

14. The Zgoubidoo Python Framework for Ray-Tracing Simulations with Zgoubi: Applications to Fixed-Field Accelerators

15. Feasibility of Slow-Extracted High-Energy Ions From the CERN Proton Synchrotron for CHARM

16. Studies of ECR Plasmas and Materials Modification Using Low Energy Ion Beam Facility at IUAC

17. The Present Status and Future Plan with Charge Stripper Ring at RIKEN RIBF

18. Commissioning Status of the RAON Superconducting Accelerator

19. The HL-LHC Project Gets Ready for Its Deployment

20. Status of the Development of the Electron Lens for Space Charge Compensation at GSI

21. The 325 MHz FAIR pLinac Ladder RFQ - Final Assembly for Commissioning

22. ReAccelerator Upgrade, Commissioning and First Experiments at the National Superconducting Cyclotron Laboratory (NSCL) / Facility for Rare Isotope Beams (FRIB)

23. Performance of Automated Synchrotron Lattice Optimisation Using Genetic Algorithm

24. Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign

25. Achievements and Performance Prospects of the Upgraded LHC Injectors

26. Layout of the 12 O’clock Collimation Straight Section for the EIC Hadron Storage Ring

27. Electromagnetic Analysis of a Circular Storage Ring for Quantum Computing Using Vsim

28. Beam Commissioning and Optimisation in the CERN Proton Synchrotron After the Upgrade of the LHC Injectors

29. High Current Heavy Ion Beam Investigations at GSI-UNILAC

30. Advances in Low Energy Antimatter Beam Generation and Manipulation

31. Status and Upgrade Plan of the MR Ring RF Systems in J-PARC

32. Influences of the Transverse Motions of the Particles to the Recombination Rate of a Co-Propagating Electron-Ion System

33. Isochronous Mode of the Experimental Storage Ring (ESR) at GSI

34. Summary of the First Fully Operational Run of LINAC4 at CERN

35. An Efficient H⁻/ D⁻ Extraction in Neutral Beam Injection (NBI) Ion Sources

36. Upgrade of Septum Magnets for Fast Extraction in J-Parc Main Ring

37. Simulations of Protons to Extraction at Gγ=7.5 in the AGS Booster

38. Fast Cycling FFA Permanent Magnet Synchrotron

39. Implementation of a Tune Sweep Slow Extraction with Constant Optics at MedAustron

40. ELENA - From Commissioning to Operation

41. Layouts for Feasibility Studies of Fixed-Target Experiments at the LHC

42. Low-Energy Negative Ion Injection Beamline for Experiments with Antiprotonic Atoms at AEgIS

43. Operational Experience and Performance of the REX/HIE-ISOLDE Linac

44. Design and Beam Dynamics Study of Disk-Loaded Structure for Muon Linac

45. Investigation of Spin-Decoherence in the NICA Storage Ring for the Future EDM-Measurement Experiment

46. EIC Crab Cavity Multipole Analysis and Their Effects on Dynamic Aperture

47. Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor

48. Commissioning the New LLRF System of the CERN PS Booster

49. Tune Control in Fixed Field Accelerators

50. Deuteron Beam Power Ramp-Up at SPIRAL2

Catalog

Books, media, physical & digital resources