894 results on '"ELLIS, REBECCA"'
Search Results
2. Commissioning to fight humidity problems
3. A TALE OF TWO PROJECTS: A detailed sequence of operation can set one project apart from the others
4. TOO MUCH CONTROL? Don't let adjustable temperature set points lead to wasted energy
5. DESIGN REVIEW READINESS: Clearly defining phase-by-phase expectations can help minimize cost and frustration on a project
6. SYSTEMS MANUALS FOR NON-BAS SYSTEMS: Don't forget about the so-called simple controls that can create complications down the road
7. WINTERIZATION AND COMMISSIONING: Is your building's HVAG system ready to handle freezing temperatures?
8. THE INTRICACIES OF AS-BUILT CONTROLS DOCUMENTATION: Manuals play a crucial role in the longevity of commissioned systems
9. MAKING MONITORING-BASED COMMISSIONING WORK: From design engineer down to facilities manager, the success is in the team effort
10. A NEW GENERATION: As the old guard retires, it's time to reinforce the crucial benefits of commissioning
11. DEFERRED & SEASONAL TESTING: Interpreting common commissioning classifications
12. EXTERIOR ENCLOSURE COMMISSIONING: An upfront investment in EECx commissioning is likely to garner healthy long-term returns
13. CONSTRUCTION TEAM CONTRACTUAL DYNAMICS: When it comes to commissioning success, who takes on the main point of responsibility?
14. TESTING-PHASE DESIGN CHANGES: Change orders, especially late in the process, can create major headaches. But there are steps to ease the pain
15. THE RIGHT TIME FOR TEST: PROCEDURE DEVELOPMENT (PART 2): Early? Late? Which works best? There are pros and cons for each
16. THE RIGHT TIME FOR TEST PROCEDURE DEVELOPMENT (PART 1): When is it? There are some reasons to think beyond the by-the-book answer
17. THE RIGHT TIME FOR TESTING: When every project and system is unique, there may not be a 'correct' time
18. INCOMPATIBLE INCENTIVES AND PENALTIES: Sometimes, chasing a bonus too aggressively can cost money
19. COMMISSIONING IS NOT MEP COORDINATION: It's nice to be brought in early, but less nice to be confused for a general contractor
20. DESIGN REVIEW WITHOUT OWNER'S PROJECT REQUIREMENTS: When there is no OPR, reach for codes, guidelines, and your own commissioning know-how
21. NO OWNER'S PROJECT REQUIREMENTS: Why would an OPR be left out of the equation? And how does the commissioning team move forward?
22. Training for engaged contractors: provide meaningful O&M commissioning training by following these guidelines
23. Training for engaged owners: you've committed to O&M training, but how do you get the most out of your efforts?
24. Automated terminal unit performance monitoring: keeping continuous tabs on your VAV units via your BAS may be worth the effort
25. VAV reheat terminal unit controls: when it comes to cost and commissioning, a standard operating sequence can make all the difference
26. VAV reheat terminal unit controls: Noncompliant programming can easily slip through until it is uncomfortably late in the process
27. Two-pipe fan-coil unit controls: looks can be deceiving when it comes to these unassuming systems
28. Commissioning mini-split systems: bells and whistles can represent extra risks in these spot cooling situations
29. Commissioning fan-powered VAV terminal units
30. Ownership of the owner's project requirements
31. commissioning: getting it right[TM]
32. Back to Basics[TM]
33. Test 118 CHILLERS IN SERIES WITH CC-2 AS LEAD, BASIC SYSTEM -- DESIGN
34. Test 119 CHILLERS IN SERIES WITH CC-2 AS LEAD, BASIC SYSTEM -- COMMISSIONING
35. Commissioning: getting it right[TM]
36. TEST 107
37. Test 108 MULTIPLE CHILLERS & CHILLED-WATER MANAGEMENT BUILDING AUTOMATION SYSTEM -- COMMISSIONING
38. Back to Basics[TM]
39. Back to Basics [TM]
40. Commissioning: getting it [right.sup.TM]
41. There's nothing like proof to help 'sell' commissioning
42. Maintenance accessibility: what is the point of functioning equipment if it can't be reached for repair?
43. Design reviews: knowing a building owner's expectations will go a long way in choosing the correct review path
44. Early turnover of systems: the right kind of chaos can justify ending the Cx process before completion
45. Integrated project delivery: done right, IPD can rescue good ideas and avoid the far-reaching consequences of some common errors
46. More on responsible parties: it's less about placing blame than finding the right person to fix the problem
47. Responsible parties: beyond the letter of the contract: when it comes to system flaws, not everything falls on the shoulders of the general contractor or the architect
48. Design review in design phase vs. construction phase: if you absolutely have to limit the commissioning role, then pick your moments wisely
49. Finding design issues late in construction: when concerns arise, weigh the pros and cons of a project delay
50. System readiness: why are there delays in testing? And how to get back on track?
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.