Search

Your search keyword '"Anders Segerstedt"' showing total 54 results

Search Constraints

Start Over You searched for: Author "Anders Segerstedt" Remove constraint Author: "Anders Segerstedt"
54 results on '"Anders Segerstedt"'

Search Results

1. Reformulated Silver-Meal and Similar Lot Sizing Techniques

5. Reformulated Silver-Meal and Similar Lot Sizing Techniques

9. Location of facilities and network design for reverse logistics of lithium-ion batteries in Sweden

12. Optimal ordering and pricing decisions for a company issuing product-specific gift cards

13. Cover-Time Planning/Takt Planning: A technique for materials requirement and production planning

14. A min-max solution to optimise planned lead time in a remanufacturing system

15. Corrigendum and a complement 'A simple heuristic for vehicle routing – A variant of Clarke and Wright's saving method' [Int. J. Prod. Econ. 157 (2014) 74–79]

16. Maintenance service strategy for leased equipment: Integrating lessor-preventive maintenance and lessee-careful protection efforts

17. Returnable packaging management in automotive parts logistics: Dedicated mode and shared mode

18. A simple heuristic for vehicle routing – A variant of Clarke and Wright's saving method

19. Effects of carbon emission regulations on remanufacturing decisions with limited information of demand distribution

20. Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems

21. Supply chain coordination with trade credit and quantity discount incorporating default risk

22. Measuring supply chain cost

23. A solution procedure for Economic Lot Scheduling Problems even in high utilisation facilities

24. Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy

25. Evaluation of forecasting error measurements and techniques for intermittent demand

26. A new heuristic to solve the one-warehouse N-retailer problem

27. Economic lot scheduling problems incorporating a cost of using the production facility

28. Restricted work-in-process: A study of differences between Kanban and CONWIP

29. Corrections of costs to feasible solutions of economic lot scheduling problems

30. A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique

31. Master Production Scheduling and a comparison of Material Requirements Planning and cover-time planning

32. Lot sizes in a capacity constrained facility—a simulation study of stationary stochastic demand

33. Frequency approach for treating capacity-constrained multilevel production

34. Inventory control with a modified Croston procedure and Erlang distribution

35. Polarica's wild berries: an example of a required storage capacity calculation and where to locate this inventory

36. The need for co-distribution in rural areas—a study of Pajala in Sweden

37. Production and inventory control at ABB Motors and Volvo Wheel Loaders, two examples of MRP in practical use

38. Lot sizes in a capacity constrained facility with available initial inventories

39. Escape from the unnecessary-some guidelines for production management

40. Lean assemble-to-order manufacturing at Ericsson

41. To Evaluate Cost Savings in a Supply Chain : Two Examples from Ericsson in the Telecom Industry

42. Product costing in ten Swedish manufacturing companies

43. A capacity-constrained multi-level inventory and production control problem

44. Cover-Time Planning, a method for calculation of material requirements

45. Inventory control with variation in lead times, especially when demand is intermittent

46. Three-dimensional performance surfaces : a tool for analysing and estimation of production system performances

47. Cover-Time Planning: A Less Complex Alternative to MRP

48. Measurements of excellence in a supply chain

49. Performance measurements in supply chains within Swedish industry

50. A note on ‘frequency approach for treating capacity constrained multi-level production’, ijpr, 42, 3119–3137

Catalog

Books, media, physical & digital resources