Search

Your search keyword '"T12 Beam Injection/Extraction and Transport"' showing total 133 results

Search Constraints

Start Over You searched for: Descriptor "T12 Beam Injection/Extraction and Transport" Remove constraint Descriptor: "T12 Beam Injection/Extraction and Transport"
133 results on '"T12 Beam Injection/Extraction and Transport"'

Search Results

1. VEPP-5 Injection Complex: New Possibilities for BINP Electron-Positron Colliders

2. Perturbation to Stored Beam by Pulse Sextupole Magnet and Disturbance of the Sextupole Magnetic Field in Aichi Synchrotron Radiation Center

3. Observations of SPS Slow-Extracted Spill Quality Degradation and Possible Improvements

4. Design and Evaluation of FCC-hh Injection Protection Schemes

5. CERN PS Kicker for Proton Injection: from Beam-Based Waveform Measurements to Hardware Improvements

6. Beam Optics Studies for BDF and for Tests of a Prototype Target

7. Slow Extraction Efficiency Measurements at CERN SPS

8. The Stripline Kicker Prototype for the CLIC Damping Rings at ALBA: Installation, Commissioning and Beam Characterisation

9. Parametric Study of the Beam Footprint Characteristics on the ESS Target

10. Beam Based Measurement of Injection Parameters at KEK-PF

11. Studies for Injection with a Pulsed Multipole Kicker at ALBA

12. Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation

13. Optimization of the Injection Kicker Bump Leakage at PETRA III

14. Efficiency and Error Analysis of the HALS Injection Scheme

15. Beam Simulation Studies for the Upgrade of the SPS Beam Dumping System

16. Progress with Carbon Stripping Foils at ISIS

17. Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC

18. Progress Toward a Dynamic Extraction Bump for Slow Extraction in the CERN SPS

19. Asynchronous Beam Dump Tests at LHC

20. Transport Line Design and Injection Configuration Optimization for the Advanced Photon Source Upgrade

21. Progress on RCS eRHIC Injector Design

22. Optimization of Diffuser (Pre-Scatterer) Configurations for Slow Extraction Loss Reduction at Electrostatic Septa

23. Beam Dynamics Simulations of the Effect of Power Converter Ripple on Slow Extraction at the CERN SPS

24. Validation of the CERN PS Eddy Current Injection Septa

25. Slow Extraction Techniques at the Marburg Ion-Beam Therapy Centre

26. High Voltage Design for the Electrostatic Septum for the Mu2e Beam Resonant Extraction

27. Beam Dynamics Calculation of a New Injection System for LINAC II

28. Geant4 Simulation of Radiation Effect on the Deflector of Extraction System in HUST SCC250

29. Investigating Beam Loss Reduction with Octupoles During Slow Extraction in the CERN SPS

30. Measurement of the Injection Beam Parameters by the Multi-Wire Scanner for CSNS

31. On-Axis Beam Accumulation Based on a Triple-Frequency RF System for Diffraction-Limited Storage Rings

32. Energy Deposition Studies and Analysis of the Quench Behavior in the Case of Asynchronous Dumps During 6.5 TeV LHC Proton Beam Operation

33. Towards Operational Scalability for H⁻ Laser Assisted Charge Exchange

34. Beam Transfer Line Design to the SPS Beam Dump Facility

35. The Swap-Out Injection Scheme for the High Energy Photon Source

36. Use of a Massless Septum to Increase Slow-Extraction Efficiency

37. Upgrade of the Dilution System for HL-LHC

38. 3D Beam Dynamics Modeling of MEBT for the New LANSCE RFQ Injector

39. Study on the Fixed Point Injection during the Beam Commissioning for CSNS

40. The Development of a New Low Field Septum Magnet System for Fast Extraction in Main Ring of J-PARC

41. Changes to the LHC Beam Dumping System for LHC Run 2

42. Measurements and Laboratory Tests on a Prototype Stripline Kicker for the CLIC Damping Rings

43. Upgrades of the CERN PS Booster Ejection Lines

44. Design Considerations of the Final Turnaround Regions for the CLIC Drive Beam

45. Feasibility Studies for the Extraction of both LHC Beams from CERN SPS using a Common Kicker

46. Technical Design of Normal Conducting Re-buncher in the MEBT for Rare Isotope Science Project

47. Energy Interlock in the NSLS II Booster to Storage Ring Transfer Line

48. Longitudinal Top-up Injection for Small Aperture Storage Rings

49. The new transfer line collimation system for the LHC high luminosity era

50. Feasibility Studies for 100 GeV Beam Transfer Lines for a CERN Neutrino Facility

Catalog

Books, media, physical & digital resources