Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
- Source :
- Power Technology and Engineering. 49:359-364
- Publication Year :
- 2016
- Publisher :
- Springer Science and Business Media LLC, 2016.
-
Abstract
- The principles of starting up the steam power unit of the Hrazdan-5 fully fired combined-cycle power unit (Hrazdan, Armenia) are considered. This plant has neither a bypass stack for gas discharge from the gas turbine nor an external steam source for the steam-turbine gland and prestarting deaeration. Emphasis is placed on the differences between the start-up procedure followed at the plant and the procedure provided by the RD 34.25.512 Standard Instructions on Startup from Various Thermal States and Shutdown of 300-MW Boiler-Turbine Sets with K-300-240 LMZ Turbine.
- Subjects :
- Gas turbines
Engineering
Combined cycle
business.industry
020209 energy
Nuclear engineering
Shutdown
Boiler (power generation)
Energy Engineering and Power Technology
02 engineering and technology
Steam-electric power station
Turbine
Automotive engineering
law.invention
Electric discharge in gases
law
Heat recovery steam generator
0202 electrical engineering, electronic engineering, information engineering
business
Subjects
Details
- ISSN :
- 15701468 and 1570145X
- Volume :
- 49
- Database :
- OpenAIRE
- Journal :
- Power Technology and Engineering
- Accession number :
- edsair.doi...........5f43f8e6f4995d98c447911795a5b5df
- Full Text :
- https://doi.org/10.1007/s10749-016-0628-4