Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations

Authors :
Izak Cohen
Noemie Balouka
Avraham Shtub
Source :
IEEE Transactions on Engineering Management. 63:4-15
Publication Year :
2016
Publisher :
Institute of Electrical and Electronics Engineers (IEEE), 2016.

Abstract

The current trend in modern project management methodologies is to maximize project values. We suggest a quantitative model that balances time, cost, and value. It generates detailed project plans, which are feasible with respect to time, cost, and resource-constraints, and considers interactions between technical performance, time, and cost. Such interactions, which existing project management models typically ignore or project managers deal with intuitively, are important for increasing projects' values. The model, which extends the multimode resource-constrained project scheduling problem by including value, generates an efficient frontier that includes the best project plans for varying project costs. We provide illustrative examples to demonstrate the suggested approach.

Details

ISSN :
15580040 and 00189391
Volume :
63
Database :
OpenAIRE
Journal :
IEEE Transactions on Engineering Management
Accession number :
edsair.doi...........e3ab9e01cc2ff2f27f362a1109bb0494
Full Text :
https://doi.org/10.1109/tem.2015.2497209